Search
Now showing items 1-2 of 2
Baseline Report for the Fort Hood Army Base: Sept. 1, 2002 - Aug. 31, 2003
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2003)
This report presents electricity, natural gas and cooling baselines for the thermal plant, buildings located in the 87000 block, III Corp building and other buildings that were determined to be part of the ESPC project at ...
LoanSTAR after 11 Years: A Report on the Successes and Lessons Learned from the LoanSTAR Program
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2002)
The Texas LoanSTAR (Loans to Save Taxes And Resources) Program was established in 1988 by the Texas Governor’s Energy Office (GEO) as a revolving loan program for funding energy conserving retrofits in state and local ...