Search
Now showing items 1-4 of 4
Economic and Conservation Evaluation of Capital Renovation Projects: Maverick County Water Control and Improvement District No. 1 (Eagle Pass) – Lining Main Canal – Preliminary
(Texas Water Resources Institute, 2004-01)
Initial construction costs and net annual changes in operating and maintenance expenses
are identified for a capital renovation project proposed by Maverick County Water Control and
Improvement District No. 1 to the ...
Economic and Conservation Evaluation of Capital Renovation Projects: Maverick County Water Control and Improvement District No. 1 (Eagle Pass) – Lining Main Canal – Final
(Texas Water Resources Institute, 2004-04)
Initial construction costs and net annual changes in operating and maintenance expenses
are identified for a capital renovation project proposed by Maverick County Water Control and
Improvement District No. 1 to the ...
An Overview of the Operational Characteristics of Selected Irrigation Districts in the Texas Lower Rio Grande Valley: Brownsville Irrigation District
(Texas Water Resources Institute, 2004-08)
Population expansion and water shortfalls have placed the Texas Lower Rio
Grande Valley (Valley) center stage in water publicity. The unique characteristics and
lack of public knowledge on how irrigation districts divert ...
Estimated Benefits of IBWC Rio Grande Flood-Control Projects in the United States
(Texas Water Resources Institute, 2004-09)
The International Boundary and Water Commission (IBWC) is responsible for
maintaining a series of flood-control projects beginning in New Mexico and extending along the
Rio Grande’s international border dividing the ...