Search
Now showing items 1-6 of 6
Development of the Potential Energy Savings Estimation (PESE) Toolkit
(Energy Systems Laboratory (http://esl.tamu.edu), 2010-08)
This study has developed a prototype computer tool called the Potential Energy Savings Estimation (PESE) Toolkit. Baltazar’s methodology for potential energy savings estimation from EBCx/retrofit measures has been improved ...
Analysis of the Potential Energy Savings for 14 Office Buildings with VAV Systems
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2010)
At the beginning of an existing building commissioning (EBCx)/energy retrofit project, some form of screening is usually applied to determine whether there is sufficient potential for savings to justify a formal EBCx ...
Inclusion of Building Envelope Thermal Lag Effects in Linear Regression Models of Daily Basis Building Energy Use Data
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2012)
Continuous Commissioning®
(Energy Systems Laboratory, 2011)
Review of the Texas Emissions Reduction Plan (TERP) Program for Political Subdivisions, Institutions of Higher Education and State Agencies
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2013)
This report provides a concise review of the Energy Systems Laboratory's experience in evaluating the Texas Emissions Reduction Plan (TERP) Program for Political Subdivisions, Institutions of Higher Education & State ...
Bridging the Gap Between Commissioning Measures and Large Scale Retrofits in Existing Buildings
(Energy Systems Laboratory, 2011-10)
Most often commissioning of existing buildings seeks to reduce a building’s energy consumption by implementation of operational changes via the existing equipment. In contrast, large scale capital retrofits seek to make ...