Search
Now showing items 1-3 of 3
The Cost-Effectiveness of Continuous Commissioning® Over the Past Ten Years
(Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)
Continuous Commissioning® data including savings, costs, and implemented measures from over 60 buildings and sites commissioned by staff from the Energy Systems Laboratory at Texas A&M University are presented. Measured ...
A Twelve Year, $10 Million Energy Initiative Marching On: the Texas A&M University Campus Energy Systems CC®
(Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)
The $58.5 million in measured savings for the twelve-year, $10 million continuous commissioning®
(CC®) program at the Texas A&M University (TAMU) makes the decision to continue easy. In today's energy environment and with ...
Continuous Commissioning® Opportunities in Hospital and Laboratory Facilities
(Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)
This paper compiles the Continuous Commissioning® (CC®) costs, savings, and opportunities implemented in 20 hospital and laboratory commissioning projects involving 48 buildings. The potential savings and costs from 25 CC ...