The Cost-Effectiveness of Continuous Commissioning® Over the Past Ten Years
(Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)
Continuous Commissioning® data including savings, costs, and implemented measures from over 60 buildings and sites commissioned by staff from the Energy Systems Laboratory at Texas A&M University are presented. Measured ...
Embedding Continuous Commissioning in an Energy Efficiency Retrofit Program
(Texas A&M University (http://www.tamu.edu)Energy Systems Laboratory (http://esl.tamu.edu), 2006)
his paper presents a case study where Continuous Commissioning (CC), a process that optimizes the HVAC system operation and controls to reduce the building energy consumption and improve comfort, was embedded as one Energy ...
Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at Texas A&M University – Commerce (TAMU–C) Commerce, Texas
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 1999)
The energy costs for TAMU-Commerce are very high when compared to most of the other universities in the TAMUs. For example, the price of $1.6 per square foot per year for utilities is nearly twice that of the Kingsville ...
Investigation of PVC Pipe Failure at Terrell State Hospital – Final Report
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2000)
At the request of Terrell State Hospital and MHMR, the Energy Systems Laboratory at Texas A&M University investigated the failure of the PVC pipes serving the chilled water loop at Terrell State Hospital. There were two ...
Continuous Commissioning® of the Dallas/Fort Worth International Airport
(Energy System Laboratory (http://esl.tamu.edu), 2008-10)
The DFW International Airport is one of the largest and busiest airports in the world. Located in North Texas, squarely between the cities of Dallas and Fort Worth, the DFW Airport not only serves a huge population in ...
Continuous Commissioning® Opportunities in Hospital and Laboratory Facilities
(Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)
This paper compiles the Continuous Commissioning® (CC®) costs, savings, and opportunities implemented in 20 hospital and laboratory commissioning projects involving 48 buildings. The potential savings and costs from 25 CC ...
Continuous Commissioning of Public Schools
(Texas A&M University (http://www.tamu.edu)Energy Systems Laboratory (http://esl.tamu.edu), 2007)
Continuous Commissioning (CC) is a proven, highly cost-effective process that can improve building comfort and reduce energy consumption. This paper discusses the CC of three public schools in Austin, Texas. These schools ...
Continuous Commissioning of a Medical Research Facility
(Texas A&M University (http://www.tamu.edu)Energy Systems Laboratory (http://esl.tamu.edu), 2007)
This paper presents a case study for Continuous Commissioning® (CC®)of a 520,000 square foot medical research facility. All of the primary energy using systems in the building were investigated to determine their existing ...
The Business and Technical Case for Continuous Commissioning for Enhanced Building Operations - A Case Study: Alamo Community College District, San Antonio, Texas, USA
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2004)
This paper provides a business and technical case study for the Continuous Commissioning®(CC®) 1 process
developed by the Energy Systems Laboratory (ESL) at Texas A&M University System for building optimization.
The business ...
How Much Can a Campus Save on Utility Bills by Turning a 5-Workday Week Into a 4Workday Week
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2003)
The recent budget cuts campaign mandated
by the governor's office had all state agencies in
Texas looking for ways to reduce revenue
spending. One of the cost savings opportunities
perceived by many university officials ...