ASHRAE's Guideline 14-2002 for Measurement of Energy and Demand Savings: How to Determine What Was Really Saved by the Retrofit
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2005)
Measured Energy Use Indices for 27 Office Buildings
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2001)
Energy use indices for 27 government office buildings are presented that have been assembled from hourly
monitored data as part of the Texas LoanSTAR program and other efforts at the Energy Systems Laboratory. These
indices ...
Development of Load Forecasting Procedures for the Texas A&M University System
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2001)
This paper reports on the effort to develop load-forecasting procedures for the Texas A&M University System
(TAMUS). Such procedures are being investigated to determine if the TAMUS can benefit from the pending
deregulation ...
Baseline Report for the Fort Hood Army Base: Sept. 1, 2001 To Aug. 31, 2002
(2002-12)
This report presents electricity, natural gas and cooling baselines for the thermal plant,
buildings located in the 87000 block, and the III Corp building at Ft. Hood. A baseline
analysis is also presented for the natural ...
Data Visualization for Quality-Check Purposes of Monitored Electricity Consumption in All Office Buildings in the ESL Database
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2000)
This report comprises an effort to visualize the monitored electricity consumption in all office buildings (not including the office buildings comprising other functions as classrooms and laboratories, for instance) in the ...
Program Overview: The Texas LoanSTAR Program; 1989-October 1999, A 10-Year Experience
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2000)
The Texas LoanSTAR (Loans to Save Taxes and Resources) program was conceived as a $98.6 million capital retrofit program for building energy efficiency. The funding source is petroleum violation escrow funds (PVE) from the ...
Program Overview: The Texas LoanSTAR Program; 1989-October 1999, A 10-Year Experience
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2000)
The Texas LoanSTAR (Loans to Save Taxes
and Resources) program was conceived as a $98.6
million capital retrofit program for building energy
efficiency. The funding source is petroleum
violation escrow funds (PVE) from the ...
Compilation of Diversity Factors and Schedules for Energy and Cooling Load Calculations, ASHRAE Research Project 1093-RP, Final Report
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2001)
This is the final report for the ASHRAE 1093-RP project. This report presents the method used to derive the diversity factors and typical load shapes of lighting and receptacle loads in office buildings. In this report the ...
Development of a Toolkit for Calculating Linear, Change–Point Linear and Multiple–Linear Inverse Building Energy Analysis Models, ASHRAE Research Project 1050-RP, Detailed Test Results
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2001)
This is the detailed test report for the ASHRAE 1050-RP project. This report presents the detailed results of the testing of IMT (Inverse Modeling Toolkit). Two kinds of testing were performed, bounds testing and accuracy ...
Measuring Energy-Saving Retrofits: Experiences from the LoanSTAR Program
(2005-09-27)
In 1988 the Governor's Energy Management Center of Texas received approval from the U.S. Department of Energy to establish a $98.6 million state-wide retrofit demonstration revolving loan program to fund energy-conserving ...