Search
Now showing items 11-15 of 15
Sustainability Assessment of the Robert E. Johnson State Office Building, Final Report, Revised April 2002
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2002)
The Robert E. Johnson State (REJ) Office building is a 5-story, 303,389 square foot office building for state legislative support staff, including Legislative House Committees, Legislative Council, State Auditor, the ...
Texas’ Senate Bill 5 Legislation for Reducing Pollution in Non-Attainment and Affected Areas: Procedures for Measuring Electricity Savings from the Adoption of the International Energy Conservation Code (IRC/IECC 2001) in New Residences
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2002)
Four areas in Texas have been designated by the EPA as non-attainment areas because ozone levels exceed the NAAQS maximum allowable limits, Beaumont-Port Arthur, El Paso, Dallas-Ft. Worth, and Houston-Galveston-Brazoria. ...
Program Overview: The Texas LoanSTAR Program; 1989-October 1999, A 10-Year Experience
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2000)
The Texas LoanSTAR (Loans to Save Taxes and Resources) program was conceived as a $98.6 million capital retrofit program for building energy efficiency. The funding source is petroleum violation escrow funds (PVE) from the ...
Procedure to Calculate NOx Reductions Using the Emissions & Generation Resource Integrated Database (E-Grid) Spreadsheet
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2003)
In this report a detailed description of the procedure to calculate NOx reductions from energy savings due to the 2000 IECC code implementation in single family residences using the United States Environmental Protect ...
U. S. Army Measurement and Verification (M&V) Costing Toolkit
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2003)
This is the 2003 final report for the U.S. Army Monitoring and Verification (M&V) costs project. The purpose of this project is to develop a M&V Costing Toolkit to be used by the government or third party planners to design ...