Visit the Energy Systems Laboratory Homepage.
LoanSTAR Monitoring and Analysis Program: Presentation Summary of the State Capitol Complex Building Operation and Maintenance Field Test
Abstract
During the Fall of 1992 a comprehensive survey was conducted on
eight buildings at the State Capitol Complex to determine potential
operations and maintenance (O&M) savings opportunities. A verbal
report of the findings was presented to General Services Commission and
Governor's Energy Office personnel in October, 1992. In January, 1993,
a formal written report titled "Potential Operation and Maintenance
(O&M) Savings at the State Capitol Complex" was transmitted to the
same GSC and GEO personnel.
Collections
Citation
Turner, W. D.; Houcek, J. K.; Liu, M.; Claridge, D. E. (1993). LoanSTAR Monitoring and Analysis Program: Presentation Summary of the State Capitol Complex Building Operation and Maintenance Field Test. Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University; Department of Mechanical Engineering, Texas A&M University. Available electronically from https : / /hdl .handle .net /1969 .1 /2117.