Show simple item record

dc.contributor.advisorClaridge, David
dc.creatorMorsy, Ahmed Mohamed
dc.date.accessioned2023-05-26T17:22:27Z
dc.date.created2022-08
dc.date.issued2022-06-23
dc.date.submittedAugust 2022
dc.identifier.urihttps://hdl.handle.net/1969.1/197727
dc.description.abstractThis research studies the estimation of peak electric demand savings as a result of implementing Continuous Commissioning®¹ (CC®) measures in commercial buildings, by using energy modeling, model calibration, and data analysis. The investigation involves developing energy models, and analyzing peak electric demand data generated by each model, in comparison with a baseline calibrated model. The study is based on a community college campus located in Fort Worth, TX, which consists of four main buildings with a total conditioned floor area of 932,000 ft². The campus underwent a CC project between 2014 and 2015, with a focus on HVAC system operational control adjustments, which resulted in an average of 34% savings in energy consumption and peak demand. The total peak demand reduction estimated by the energy models developed in this study is 30%. The peak demand of the campus was examined before and after the implementation of the Continuous Commissioning project. This research simulates the peak demand savings as a result of applying all CC measures, as well as investigates the independent impact of Continuous Commissioning (CC) measures on peak electric demand, to help prioritize CC measures based on peak demand savings along with the usually-assessed energy consumption savings. The energy modeling is based on a combination of physics-based and black-box modeling techniques, by utilizing EnergyPlus™ and WinAM; an Energy Systems Laboratory’s internally-developed software based on the ASHRAE Simplified Energy Analysis Procedure (SEAP). The modeling framework used in this research is found to be capable of accurately simulating the peak demand savings by developing calibrated energy models based on energy consumption, and meeting the ASHRAE Guideline 14 energy modeling calibration criterion. It is found that some CC measures generate significant peak demand savings, while other measures do not have a considerable impact on peak demand, even though they generate energy consumption savings. This conclusion will help energy researchers and engineers prioritize and analyze different CC measures based on the economics of the facility and the needs of its owners.
dc.format.mimetypeapplication/pdf
dc.language.isoen
dc.subjectPeak Demand
dc.subjectCommissioning
dc.subjectBuildings
dc.subjectDemand Response
dc.subjectForecast
dc.subjectWeather
dc.subjectEnergy
dc.subjectHVAC
dc.titleThe Impact of Continuous Commissioning on Peak Electric Demand in Buildings
dc.typeThesis
thesis.degree.departmentMechanical Engineering
thesis.degree.disciplineMechanical Engineering
thesis.degree.grantorTexas A&M University
thesis.degree.nameDoctor of Philosophy
thesis.degree.levelDoctoral
dc.contributor.committeeMemberCulp, Charles
dc.contributor.committeeMemberPate, Michael
dc.contributor.committeeMemberRasmussen , Bryan
dc.type.materialtext
dc.date.updated2023-05-26T17:22:27Z
local.embargo.terms2024-08-01
local.embargo.lift2024-08-01
local.etdauthor.orcid0000-0003-2924-479X


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record