Show simple item record

dc.contributorAsia Turbomachinery & Pump Symposium (2nd : 2021)
dc.creatorBhattacharya, Mantosh
dc.date.accessioned2023-02-23T20:10:34Z
dc.date.available2023-02-23T20:10:34Z
dc.date.issued2021
dc.identifier.urihttps://hdl.handle.net/1969.1/197466
dc.descriptionCase Studies
dc.description.abstractTwo mission critical electric motor driven BFW (Boiler Feed Water) pumps installed in remote site, facedcontinuous failures of rotor-stator seizures during commissioning and start up of Sulfur recovery units -Pumps had to be refurbished many times at service center by shifting from site and complete dismantling One of the Electric Motor faced several months of outage , bent rotor due to start up attempts These activity posed critical concern over project completion schedule
dc.format.mediumElectronic
dc.format.mimetypeapplication/pdf
dc.language.isoen
dc.publisherTurbomachinery Laboratory, Texas A&M Engineering Experiment Station
dc.relation.ispartofAsia Turbomachinery & Pump Symposia. 2021 Proceedings
dc.titleCS04: Mitigation of perennial seizure of boiler feed water pumps during commissioning of refinery unit
dc.type.genreconference publication
dc.type.materialText
dc.format.digitalOriginborn digital


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record