Show simple item record

dc.contributorAsia Turbomachinery & Pump Symposium (3rd : 2022)
dc.creatorFaiz, Ahmad
dc.date.accessioned2023-01-25T22:57:03Z
dc.date.available2023-01-25T22:57:03Z
dc.date.issued2022
dc.identifier.urihttps://hdl.handle.net/1969.1/197017
dc.descriptionCase Studies
dc.description.abstractCase study include a vertical pump in sour water service running at high speed of 17200rpm. Pump originally equipped with single seal & Plan 21 configuration since day one. In 2018, as part of a reliability upgrade, seal was converted to a double seal design (Plan53A). Pump MTBF reduced from 24 months to 6 months. While utilizing existing Plan 53A, a practical & cost effective approach is to have external cooling supply to seal chamber. Plan 32 then is introduced; together with seal scallop design upgrade and reducing amount of elbows on current seal piping system. With new upgrade changes, the pump seal has been operating satisfactory since commissioning, exceeding its previous operating life.
dc.format.mediumElectronic
dc.format.mimetypeapplication/pdf
dc.language.isoen
dc.publisherTurbomachinery Laboratory, Texas A&M Engineering Experiment Station
dc.relation.ispartofAsia Turbomachinery & Pump Symposium. 2022 Proceedings.
dc.titleHIGH SPEED PUMP: MECHANICAL SEAL BAD ACTOR RESOLUTION
dc.type.genreconference publication
dc.type.materialText
dc.format.digitalOriginborn digital


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record