Show simple item record

dc.contributor.otherInternational Pump Users Symposium (34th : 2018)
dc.creatorCooper, Landon
dc.date.accessioned2019-03-12T19:48:45Z
dc.date.available2019-03-12T19:48:45Z
dc.date.issued2018
dc.identifier.urihttps://hdl.handle.net/1969.1/174977
dc.descriptionCase Studyen
dc.description.abstractCustomer has four 4x8x13 BB1 booster pumps for produced water injection. One pump was recently repaired and ran for only 4 months. Typically these pumps run about 16-18 months. Before shutting down the pump it had a high 1x vibration. It was discovered that the pump clearances had increased to 5x running clearances. The customer wanted to increase the mean time between repairs. A solution was derived doing a lateral dynamic analysis.en
dc.format.mediumElectronicen
dc.format.mimetypeapplication/pdf
dc.language.isoen
dc.publisherTurbomachinery Laboratory, Texas A&M Engineering Experiment Station
dc.relation.ispartofProceedings of the 34th International Pump Users Symposiumen
dc.subject.lcshPumping machineryen
dc.titleBB1 Lateral Dynamic Analysisen
dc.type.genreconference publicationen
dc.type.materialTexten
dc.format.digitalOriginborn digitalen


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record