dc.contributor | Middle Eastern Turbomachinery Symposium (3rd : 2015) | |
dc.creator | Khader, Ameer | |
dc.creator | White, Nicholas | |
dc.date.accessioned | 2018-10-12T19:55:51Z | |
dc.date.available | 2018-10-12T19:55:51Z | |
dc.date.issued | 2015 | |
dc.identifier.uri | https://hdl.handle.net/1969.1/172654 | |
dc.description | Case Study | en |
dc.description.abstract | • In an LNG production plant, multiple propane (PR)
refrigeration compressor failures since commissioning led to
re-wheeling
• PR refrigeration system was not considered to be the main
bottleneck, nevertheless improved production rates were
realized
• Full refrigeration system machinery evaluation highlighted
the main uplift to be a result of improvement in the Mixed
Refrigerant (MR) system
• Thermodynamic coupling of upgraded PR loop with MR loop
resulted in added capacity to MR loop | en |
dc.format.medium | Electronic | en |
dc.format.mimetype | application/pdf | |
dc.language.iso | en | |
dc.publisher | Turbomachinery Laboratory, Texas A&M Engineering Experiment Station | |
dc.relation.ispartof | Middle East Turbomachinery Symposia. 2015 Proceedings. | en |
dc.subject.lcsh | Turbomachines | en |
dc.title | Evaluation of LNG Train Operation Resulting from Refrigeration Compressor Re-wheel | en |
dc.type.genre | conference publication | en |
dc.type.material | Text | en |
dc.format.digitalOrigin | born digital | en |