Show simple item record

dc.contributorMiddle Eastern Turbomachinery Symposium (3rd : 2015)
dc.creatorKhader, Ameer
dc.creatorWhite, Nicholas
dc.date.accessioned2018-10-12T19:55:51Z
dc.date.available2018-10-12T19:55:51Z
dc.date.issued2015
dc.identifier.urihttps://hdl.handle.net/1969.1/172654
dc.descriptionCase Studyen
dc.description.abstract• In an LNG production plant, multiple propane (PR) refrigeration compressor failures since commissioning led to re-wheeling • PR refrigeration system was not considered to be the main bottleneck, nevertheless improved production rates were realized • Full refrigeration system machinery evaluation highlighted the main uplift to be a result of improvement in the Mixed Refrigerant (MR) system • Thermodynamic coupling of upgraded PR loop with MR loop resulted in added capacity to MR loopen
dc.format.mediumElectronicen
dc.format.mimetypeapplication/pdf
dc.language.isoen
dc.publisherTurbomachinery Laboratory, Texas A&M Engineering Experiment Station
dc.relation.ispartofMiddle East Turbomachinery Symposia. 2015 Proceedings.en
dc.subject.lcshTurbomachinesen
dc.titleEvaluation of LNG Train Operation Resulting from Refrigeration Compressor Re-wheelen
dc.type.genreconference publicationen
dc.type.materialTexten
dc.format.digitalOriginborn digitalen


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record