Search
Now showing items 1-6 of 6
Instructions for "The Great Energy Predictor Shootout II: Measuring Retrofit Energy Savings"
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1994)
Based on the overwhelming response to the first Building Energy Predictor Shootout a second predictor Shootout has been developed to again compare how well different empirical models predict building energy data from several ...
Preliminary Study of O&M Opportunities at the University of Texas Medical Branch at Galveston, Submitted to The Energy Management and Operations Department at UTMB Galveston
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1994)
At the request of the Energy Management and Operations Department at the University of Texas Medical Branch at Galveston, the Energy Systems Laboratory at the Texas A&M University performed the preliminary study of O&M ...
Cool Storage Applications in the Texas LoanSTAR Program: Overview and Preliminary Results
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1994)
Cool Storage Systems (CSS) are becoming a popular demand side management tool for utilities because that helps them avoid costly plant expansions and reduces summer-time peak electricity demand. This paper presents an ...
Thermal Energy Measurement with Tangential Paddlewheel Flow Meters: Summary of Experimental Results and in-situ Diagnostics
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1994)
Recently third-party financing has become a popular mechanism for funding energy conservation retrofits in commercial/institutional buildings. Although many successful projects have been heralded by the press quite a few ...
The USDOE Forrestal Building Lighting Retrofit: Preliminary Analysis of Electricity Savings
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1994)
In September of 1993 a 36,832 fixture lighting retrofit was completed at the United States Department of Energy Forrestal complex in Washington, D.C. This retrofit represents DOE's largest project to date that utilizes a ...
Analysis of Energy Conservation Options for USDOE Child Development Center, Final Summary Report
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1994)
The U.S.D.O.E. Forrestal Child Development Center (CDC) was designed to be a "showpiece" model building. Its construction included energy efficient features such as efficient lighting, a photovoltaic system, an energy ...