Search
Now showing items 51-60 of 97
Savings Analysis of Utility Bills for Unmonitored Sites, Volume II: Detailed Savings Calculations, Texas LoanSTAR Monitoring and Analysis Program
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1995)
Detailed calculations for each site are shown in this Volume. For each site the ECRM description, approved loan amount, expected savings, the pre and post-retrofit energy use (electricity and gas separately), cost of energy, ...
Use of Energy Management and Control Systems for Performance Monitoring of Retrofit Projects: Final Summary Report for USDOE Office of Conservation and Energy, Final Revision, March 1993
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1991)
Traditionally, Energy Management and Control Systems (EMCSs) have been used to control
HVAC, lighting, fire and security systems in buildings. Few EMCSs are used for long term
trending and analysis of energy use (i.e., ...
Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at Texas A&M University -- Corpus Christi (TAMU-CC) Corpus Christi, Texas
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 1999)
The physical plant director and staff at Texas A&M University-Corpus Christi (TAMUCC) do a very good job of maintaining TAMU-CC and keeping expenses down. During our visit, however, we were able to identify several ...
Development of Baseline Monthly Utility Models, Stabilization of Data Logging Environment and Development of Metering Plan and Shopping List for Fort Hood, Texas
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1995)
This report has been prepared for the United States Army Construction Engineering Research Laboratories (CERL) located at Champaign, IL. The report describes the work performed by the Energy Systems Laboratory (ESL) of ...
Assessment and Suggestions to Improve the Commercial Building Module of EIA-NEMS
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1996)
The National Energy Modeling System (NEMS) is a comprehensive, computer-based, energy-economy modeling system developed and maintained by the Department of Energy's Energy Information Administration (EIA). NEMS forecasts ...
Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at Texas A&M University – Kingsville (TAMU–K) Kingsville, Texas
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 1999)
The physical plant director and staff at Texas A&M University - Kingsville (TAMU-K) do a very good job of maintaining TAMU-K facilities and keeping expenses down. During our visit, however, we were able to identify several ...
Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at West Texas A&M University (WTAMU) Canyon, Texas
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 1999)
The physical plant director and staff at West Texas A&M University (WTAMU) do a very good job of maintaining WTAMU facilities and keeping expenses down. During our visit, however, we were able to identify several opportunities ...
Development of Energy-Efficient Housing for Low-Income Texas Residents
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 1999)
The purpose of this Center for Energy and Mineral Research (CEMR) funded study is to improve the energy use in low-income housing in the State of Texas. This study aims at achieving energy-efficiency by using a combination ...
Compilation of Diversity Factors and Schedules for Energy and Cooling Load Calculations, Phase II Report - Identified Relevant Data Sets, Methods, and Variability Analysis
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 1999)
This is the second report of the ASHRAE 1093-RP project that reports on the progress during the scheduled Phase II effort. In this report, we present: (1) the data sets identified and acquired required for the analysis; ...
Sample M&V Plan from the Texas Workshop: Preparing and Evaluating Measurement and Verification Plans for Energy Performance Contracts in Texas
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 1999)
This document contains a sample M&V plan that has been prepared in accordance with the Texas Guidelines for Measurement and Verification for Energy Performance Contracts. This sample M&V plan was extracted from the March ...