Search
Now showing items 1-5 of 5
Case Study of Continuous Commissioning in an Office Building
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2006)
The case study building is a two-story office facility with total floor area of 31000 square feet, of which most is open space office. The HVAC system operates 24 hours a day, 7 days a week. An energy audit was conducted ...
Study of a Fault Analysis System for a Heat Supply Network Based on GIS
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2006)
Conventional methods cannot satisfy the request of the layout and operation management in a heating system. The geographical information system (GIS) in a heat supply network can realize information conformity and information ...
Optimal Terminal Box Control for Single Duct Air-Handling Units
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2006)
Terminal boxes maintain room temperature by modulating supply air temperature and airflow in building HVAC systems. Terminal boxes with conventional control sequences often supply inadequate airflow to a conditioned space, ...
Optimal Outside Air Control for Air Handling Units with Humidity Control
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2006)
Most air handling units (AHUs) in commercial buildings have the (air) economizer cycle to use outside air for free cooling under certain outside air conditions. Ideally the economizer cycle is enabled if outside air enthalpy ...
Application Study of the Pump Water Flow Station for Building Energy Consumption Monitoring and Control Optimization
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2006)
This paper presents a new building energy monitoring and pump speed control method. The pump speed is controlled to maintain the system resistance at an optimized value to approach the best pump efficiency and save pump ...