Now showing items 1-1 of 1

    • Keller, D. C.; Bynum, D.; Kosla, L. (Energy Systems Laboratory (http://esl.eslwin.tamu.edu), 1987-09)
      In 1983 Frito-Lay embarked on building a new 160,000 sq. ft. manufacturing facility in Kern County California. Based upon an estimated steam load between 5,000 and 50,000 lb/hr and an electrical load of approximately ...