Now showing items 1-2 of 2

    • Turner, W. D.; Baltazar-Cervantes, J. C.; Zeig, G.; Wei, G. (Texas A&M University (http://www.tamu.edu); Energy Systems Laboratory (http://esl.tamu.edu), 2007)
      This paper presents a case study for Continuous Commissioning® (CC®)of a 520,000 square foot medical research facility. All of the primary energy using systems in the building were investigated to determine their existing ...
    • Jones, A.; Claridge, D. E.; Turner, W. D.; Deng, S.; Wei, G.; Zeig, G. (Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)
      This paper compiles the Continuous Commissioning® (CC®) costs, savings, and opportunities implemented in 20 hospital and laboratory commissioning projects involving 48 buildings. The potential savings and costs from 25 CC ...