dc.contributor.other | Turbomachinery Symposium (1st : 1972) | |
dc.creator | Reddy, Ramana | |
dc.date.accessioned | 2017-10-05T14:59:54Z | |
dc.date.available | 2017-10-05T14:59:54Z | |
dc.date.issued | 1972 | |
dc.identifier.uri | https://hdl.handle.net/1969.1/163873 | |
dc.description | Paper | en |
dc.description | Pg. 26-38. | en |
dc.description.abstract | Sixteen centrifugal stages in two cases driven by a Rolls Royce AVON jet and a single stage power turbine compress natural gas of Mol Weight 23 from a pressure of 65 to 2000 psia. The rotating train, the coolers, the scrubbers and all systems mounted on a double-deck platform weighing 200 tons is pumping gas in the Lake Maracaibo, Venezuela, since February 1972. This paper deals with design concepts, protective devices, pre-testing of package simulating field conditions, and initial problems encountered during commissioning the unit. | en |
dc.format.medium | Electronic | en |
dc.format.mimetype | application/pdf | |
dc.language.iso | en | |
dc.publisher | Texas A&M University. Gas Turbine Laboratories | |
dc.relation.ispartof | Proceedings of the 1st Turbomachinery Symposium | en |
dc.subject.lcsh | Turbomachines | en |
dc.title | Commissioning A Gas Turbine-Compressor Single Lift Package For Offshore Gas Reinjection Applications | en |
dc.type.genre | Presentation | en |
dc.type.material | Text | en |
dc.identifier.doi | https://doi.org/10.21423/R15665 | |