Show simple item record

dc.contributor.otherTurbomachinery Symposium (17th : 1988)
dc.creatorWilliams, Steve
dc.creatorBrandon, Ronald
dc.date.accessioned2017-10-05T14:29:04Z
dc.date.available2017-10-05T14:29:04Z
dc.date.issued1988
dc.identifier.urihttps://hdl.handle.net/1969.1/163608
dc.descriptionLectureen
dc.descriptionPg. 77-84en
dc.description.abstractThe losses in turbine performance due to excessive leakages in the labyrinth seals can result in significant heat rate degradation to the turbine cycle. The modified packing arrangement described helps eliminate the rubs that occur during startups, which is the major cause of excessive clearance. This packing was first installed at two utility generating stations. The performance of these units were monitored to evaluate the packing and these results are discussed in detail.en
dc.format.mediumElectronicen
dc.format.mimetypeapplication/pdf
dc.language.isoen
dc.publisherTexas A&M University. Turbomachinery Laboratories
dc.relation.ispartofProceedings of the 17th Turbomachinery Symposiumen
dc.subject.lcshTurbomachinesen
dc.titleOperating Experience With Improved Steam Turbine Packing Rings.en
dc.type.genrePresentationen
dc.type.materialTexten
dc.identifier.doihttps://doi.org/10.21423/R1D09D


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record