Fast And Ultimate Vibration Field Solution: From Problem Detection To Field Performance Validation
(Texas A&M University. Turbomachinery Laboratories, 2010)
Experience With API Plan 53b Pressurized Dual Seal Systems
(Texas A&M University. Turbomachinery Laboratories, 2010)
Plan 53B is one of the newest API seal flush plans. It first appeared in the second edition of API 682. This case history is based on experience on a large project in China. This petrochemical complex is the first that the ...
Evaluating And Correcting Subsynchronous Vibration In Vertical Pumps
(Texas A&M University. Turbomachinery Laboratories, 2010)
Mechanical Vibration Testing Reciprocating Pumps
(Texas A&M University. Turbomachinery Laboratories, 2010)
Corrosion And Materials Issues In Converting A Conventional Pump To A Canned Motor Pump - Experience Is What You Have Just After You Needed It
(Texas A&M University. Turbomachinery Laboratories, 2010)
Modeling And Simulation Transient Analysis Case Study Of A Liquids Gathering System
(Texas A&M University. Turbomachinery Laboratories, 2010)
Simple Hydraulic Retrofit Solves Field Vibration Problem Of A Horizontal Pump
(Turbomachinery Laboratory, Texas A&M University, 2010)
The True Cost Of External Seal Flush (Piping Plan 32)
(Turbomachinery Laboratory, Texas A&M University, 2010)
Dramatic Vibration Improvement Due To Ring-Section Pump Foundation Repair Based On ODS In A Power Plant
(Texas A&M University. Turbomachinery Laboratories, 2010)
Investigation And Resolution Of Intermittent Loss Of Flow In A Diaphragm Metering Pump
(Texas A&M University. Turbomachinery Laboratories, 2010)
Pump adds an ingredient to a reaction vessel. Both short periods of loss of flow and long periods of excessive flow variation will impact product quality. Correct performance of this pump is critical to uptime and first ...