Search
Now showing items 1-1 of 1
Continuous Commissioning® of the Austin City Hall
(Energy Systems Laboratory (http://esl.tamu.edu), 2009-11)
This paper presents a case study of a Continuous Commissioning (CC) project performed at the Austin City Hall. Various CC measures were implemented and significant energy savings were achieved. The paper illustrates a ...