Search
Now showing items 1-4 of 4
Connecting Stakeholders, Achieving Green
(Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)
If Green is gold, why is progress so slow? The public understanding of Green is evolving. Standards are being developed, but there is still much work to be done. Achieving Green is difficult. Necessary conditions include:
•A ...
A Study of the Advanced Systems at the CMU Intelligent Workplace with an Evaluation of Potential Applications to Texas A&M International University
(Energy Systems Laboratory (http://esl.tamu.edu), 2008-04)
A detailed study has been conducted of the performance of several innovative aspects of the Intelligent Workplace (IW) at Carnegie Mellon University, a low energy consumption building that uses radiant heating, cooling and ...
Busting the Myth That Green Costs More Green
(Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)
Buildings are one of the largest consumers of resources and energy in this country, and according to the AIA (American Institute of Architects) are responsible for almost half of all carbon emissions in the United States. ...
The Development of a Global Example- Our Headquarters are becoming a "Green Building"
(Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)
The Deutsche Bank towers in Frankfurt-am- Main, headquarters and emblem of one of Germany's largest banks are being converted into one of the world's most environmentally friendly high-rise buildings. This comprehensive ...