Search
Now showing items 1-2 of 2
Continuous Commisssioning of a Multipurpose Facility
(Energy Systems Laboratory (http://esl.tamu.edu), 2009-11)
This paper presents a case study for the optimization of a multipurpose facility in a school district. The facility is a single-story building with a total conditioned area of 35,571 ft2. It contains a full size basketball ...
Continuous Commissioning® of the Austin City Hall
(Energy Systems Laboratory (http://esl.tamu.edu), 2009-11)
This paper presents a case study of a Continuous Commissioning (CC) project performed at the Austin City Hall. Various CC measures were implemented and significant energy savings were achieved. The paper illustrates a ...