Search
Now showing items 1-3 of 3
LoanSTAR Energy Auditing: Update and Changes
(Energy Systems Laboratory (http://esl.eslwin.tamu.edu), 1992-05)
Annual savings identified by detailed LoanSTAR audits during the period January, 1989 -December, 1991 are $13.7 million with an investment cost of $46.1 million. These savings represent retrofit projects in state-owned ...
Texas LoanSTAR Monitoring and Analysis Program: Report to the Monitoring and Analysis Review Committee, August 1991 (Volume I)
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1991)
The LoanSTAR program has now completed its second prototype year. This report is Volume I of a two volume set that documents the progress since the January 1991 MARC meeting. This first voume contains photocopies of the ...
The Texas LoanSTAR Monitoring and Analysis Program: Report to the Monitoring and Analysis Review Committee, August 1991 (Volume II)
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1991)
The LoanSTAR program has now completed its second prototype year. This report
is Volume II of a two volume set that documents the progress since the January 1991
MARC meeting.
This second volume contains papers and ...