Search
Now showing items 1-4 of 4
Data Polling Routine (PlotHood) to Generate Weekly Inspection Plots for Fort Hood, Texas
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1996)
This report has been prepared for the United States Army Construction Engineering Research Laboratories (CERL) located at Champaign, IL. The report describes the work performed by the Energy Systems Laboratory (ESL) of ...
A Report on the Environmental Impact of the Texas LoanSTAR Program from May 1989 to September 1995
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1995)
The Texas LoanSTAR (Loans to Save Taxes and Resources) program was created by the state of Texas in 1989 to lend money for energy conserving improvements, or retrofits, in public buildings. As of September 1995 the LoanSTAR ...
Development and Use of Baseline Monthly Utility Models for Eight Army Installations Around the United States
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1996)
This report has been prepared for the United States Army Construction Engineering Research Laboratories (USACERL) located in Champaign, IL by the Energy Systems Laboratory (ESL) of Texas A&M University. The first phase of ...
Development of Baseline Monthly Utility Models, Stabilization of Data Logging Environment and Development of Metering Plan and Shopping List for Fort Hood, Texas
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1995)
This report has been prepared for the United States Army Construction Engineering Research Laboratories (CERL) located at Champaign, IL. The report describes the work performed by the Energy Systems Laboratory (ESL) of ...