Search
Now showing items 1-2 of 2
A Simple and Quick Chilled Water Loop Balancing for Variable Flow System
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2000)
For many modem buildings, the chilled water
loops and risers are equipped with variable speed
pumping systems. How to quickly balance the
loop or riser to satisfy the cooling requirement
and reduce energy consumption is a ...
Using Simulation Models for Building Commissioning
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2004)
The International Energy Agency ECBCS Annex 40 “Commissioning of Buildings and HVAC
Systems for Improved Energy Performance” task investigating Use of Whole Building Simulation in
Commissioning has identified the following ...