Search
Now showing items 1-1 of 1
Replacement Of The Boiler Feedpumps During The Retrofit Of The 500 Mw Units At A German Power Station
(Texas A&M University. Turbomachinery Laboratories, 1997)
The Janschwalde Power Station consists of six 500 MW units that were commissioned between 1981 and 1989. These units, which were equipped with turbo feedpumps manufactured in Russia, had an average efficiency of only 78 ...