Experiences on the Implementation of the 'Energy Balance' Methodology as a Data Quality Control Tool: Application to the Building Energy Consumption of a Large University Campus
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2007)
As the energy costs have been increasing the more energy efficient measures have been promoted in the buildings sector, the reliability of energy consumption data has been attracting significant attention. For example, the ...
Development of a Heat Transfer Model for the Integrated Facade Heating
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2007)
Façade heating is a special application of radiant heating and cooling technology and is used to enhance the indoor comfort level of offices, hotels and museums. Mullion radiators are typically used to implement façade ...
Infiltration Investigation of a Radiantly Heated or Cooled Office
(Texas A&M University (http://www.tamu.edu)Energy Systems Laboratory (http://esl.tamu.edu), 2007)
Air infiltration has a significant impact on the heating and cooling loads of small office and residential buildings. In a radiantly heated and cooled office, air infiltration normally determines whether this type of system ...
Methodology for the Determination of Potential Energy Savings in Commercial Buildings
(Texas A&M University (http://www.tamu.edu)Energy Systems Laboratory (http://esl.tamu.edu), 2007)
This paper describes a methodology to determine potential energy savings of buildings with limited information. This methodology is based upon the simplified energy analysis procedure of heating, ventilation and air condition ...
A Follow-up Study on the Persistence of Savings from the Retrocommissioning of Ten Buildings on a University Campus: Preliminary Results
(2007-09-11)
A study has been initiated to provide follow-up analysis on the persistence of savings achieved from the retrocommissioning of ten buildings on a university campus. The buildings were originally commissioned in 1996, and ...