Energy Savings Assessment for the Robert E. Johnson State Office Building in Austin, Texas
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
U.S. businesses and institutions spend an
estimated $175 billion per year for energy. Of that, the
fraction under performance contracts and energy
service agreements is currently growing, aided by
cheaper monitoring ...
Texas’ Senate Bill 5 Legislation for Reducing Pollution in Non-Attainment and Affected Areas: Annual Report to the Texas Natural Resource Conservation Commission
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2002)
This is the first annual report by the Energy Systems Laboratory, which covers the Laboratory's efforts to support Senate Bill 5. In this report the accomplishments and progress to date are presented, along with recommendations, ...
Texas’ Senate Bill 5 Legislation for Reducing Pollution in Non-Attainment and Affected Areas: Report for the TERP Advisory Board Meeting
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2002)
This report outlines the Energy Systems Laboratory's responsibilities in Senate Bill 5, accomplishments to date, recommendations to the TERP Advisory Group, and problems encountered to date and what is needed to fulfill ...
LoanSTAR after 11 Years: A Report on the Successes and Lessons Learned from the LoanSTAR Program
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2002)
The Texas LoanSTAR (Loans to Save Taxes And Resources) Program was established in 1988 by the Texas Governor’s Energy Office (GEO) as a revolving loan program for funding energy conserving retrofits in state and local ...
Development of a Toolkit for Calculating Linear, Change-Point Linear and Multiple-Linear Inverse Building Energy Analysis Models, ASHRAE Research Project 1050-RP, Final Report
(Energy Systems Laboratory, Texas A&M University, 2002-11-01)
This report summarizes the results of ASHRAE Research Project 1050: Development
of a Toolkit for Calculating Linear, Change-Point Linear and Multiple Linear Inverse
Building Energy Analysis Models. The Inverse Modeling ...
An Introduction to Texas Senate Bill 5
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
Four areas in Texas have been designated by the
U.S. Environmental Protection Agency (EPA) as
non-attainment areas because ozone levels
exceed the National Ambient Air Quality
Standards (NAAQS) maximum allowable ...
Improving Boiler Efficiency Modeling Based On Ambient Air Temperature
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
Optimum economic operation in a large
power plant can cut operating costs substantially.
Individual plant equipment should be operated
under conditions that are most favorable for
maximizing its efficiency. It is widely ...
Baseline Report for the Fort Hood Army Base: Sept. 1, 2001 To Aug. 31, 2002
(2002-12)
This report presents electricity, natural gas and cooling baselines for the thermal plant,
buildings located in the 87000 block, and the III Corp building at Ft. Hood. A baseline
analysis is also presented for the natural ...
Automated Data Quality Analysis Research and Development
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2002)
The Automated Data Quality process development is an effort to automate the analysis and
monitoring of the Energy Systems Lab's (ESL) polling and energy data process. Polling status
refers to basic telecommunication line ...
Sustainability Assessment of the Robert E. Johnson State Office Building, Final Report, Revised April 2002
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2002)
The Robert E. Johnson State (REJ) Office building is a 5-story, 303,389 square foot office building for state legislative support staff, including Legislative House Committees, Legislative Council, State Auditor, the ...