Search
Now showing items 1-4 of 4
Continuous Commissioning: A Valuable Partner to Retrofit Projects
(Texas A&M University (http://www.tamu.edu)Energy Systems Laboratory (http://esl.tamu.edu), 2001)
Continuous Commissioning (CC) or HVAC system
optimization is not only a valuable stand-alone energy
saving measure for commercial buildings, but it is also
an important escort solution to retrofit projects. Energy
retrofit ...
Continuous Commissioning(SM) of a Thermal Storage System
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2001)
Chilled water thermal storage systems can
reduce the electrical demand charge during the onpeak
months. However, operational problems such as
the inability to fully charge the system or premature
discharge of the stored ...
Measured Energy Use Indices for 27 Office Buildings
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2001)
Energy use indices for 27 government office buildings are presented that have been assembled from hourly
monitored data as part of the Texas LoanSTAR program and other efforts at the Energy Systems Laboratory. These
indices ...
Lessons and Measures Learned from Continuous Commissioning(SM) of Central Chilled/Hot Water Systems
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2001)
As it has been proved repeatedly that
commissioning is very necessary for new construction
and renovation/retrofit projects, we found continuous
commissioningSM (CC) is an effective and efficient
way to manage and optimize ...