Continuous Commissioning Results Verification and Follow-up For an Institutional Building: A Case Study
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
The Kleberg Building on the Texas A&M
University campus is a teaching/research facility
consisting of classrooms, offices and laboratories,
with a total floor area of approximately 165,030 ft2.
Continuous Commissioning ...
The Temperature and Relative Humidity Control in Cushing Library
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
Cushing Library located on TAMU campus is a
special building, which needs precise temperature
and relative humidity control, because it stores a
number of rare collections and memorial books.
There are five air-handling ...
LoanSTAR after 11 Years: A Report on the Successes and Lessons Learned from the LoanSTAR Program
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2002)
The Texas LoanSTAR (Loans to Save Taxes And Resources) Program was established in 1988 by the Texas Governor’s Energy Office (GEO) as a revolving loan program for funding energy conserving retrofits in state and local ...
Results of CC Follow-Up in the G. Rollie White Building
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
An investigation into the increase of energy
consumption of G. Rollie White Coliseum was part
of the persistence project[1], which investigates the
savings in energy consumption of ten buildings that
were commissioned by ...
Improving Boiler Efficiency Modeling Based On Ambient Air Temperature
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
Optimum economic operation in a large
power plant can cut operating costs substantially.
Individual plant equipment should be operated
under conditions that are most favorable for
maximizing its efficiency. It is widely ...
Baseline Report for the Fort Hood Army Base: Sept. 1, 2001 To Aug. 31, 2002
(2002-12)
This report presents electricity, natural gas and cooling baselines for the thermal plant,
buildings located in the 87000 block, and the III Corp building at Ft. Hood. A baseline
analysis is also presented for the natural ...
Correcting Thermal Distribution Problems for a Large University Campus
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
Texas A&M University main campus in
College Station consists of 114 buildings served by
two central plants. The two main campus loops are
more than 50 years old with a total piping length for
each loop in excess of 13 ...