Case Studies of Energy Information Systems and Related Technology: Operational Practices, Costs, and Benefits
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2003)
Energy Information Systems (EIS), which can
monitor and analyze building energy consumption
and related data throughout the Internet, have been
increasing in use over the last decade. Though EIS
developers describe the ...
An Energy Analysis of the Catalytic Combustion Burner
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2006)
The gas boilers of conventional flame always produce varying degrees of combustion products NOx and CO, which pollute the environment and waste energy. As a new way of combustion, catalytic combustion breaks the flammable ...
Enhancing Building Operations Through Automated Diagnostics: Field Test Results
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2003)
The Whole Building Diagnostician (WBD) is a
modular diagnostic software system that provides
detection and diagnosis of problems with the
operation of heating, ventilation, and air-conditioning
(HVAC) systems and major ...
Fault Detection and Diagnosis Method for VAV Terminal Units
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2004)
This paper proposes two fault detection and diagnosis methods for VAV units without a sensor of
supply air volume, and the results of applying these methods to a real building are presented. One method
detects faults by ...
Automatic Commissioning of Multiple VAV Terminals
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2004)
A site survey on a modern operating commercial building screened 261 ineffective VAV (Variable
Air Volume) boxes (20.9% of the total boxes in the building) and summarized ten typical faults for VAV
air-conditioning system(s) ...
Continuous Commissioning of Salt Lake Community College South City Campus
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2004)
The State of Utah's Department of Natural Resources funded two projects in Salt Lake City to
demonstrate the feasibility of the Continuous Commissioning® (CC®)1 process. The two sites selected were a modern state
building, ...
Implementation of Partial Initial Commissioning During the Elaboration and Construction Phase
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2004)
This paper describes how manual methods for partial initial commissioning can be implemented
during the elaboration and construction phase. The main purpose is to reduce the risk of exceeding
the time schedule and the ...
Commissioning of Building HVAC Systems for Improved Energy Performance: A Summary of Annex 40 Results
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2004)
Annex 40 is an international research project which aims at developing,
validating and documenting tools for commissioning of buildings and
building services. A few months before the end of this 4 years project one
presents ...
Embedded Commissioning for Building Design
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2004)
Building Commissioning has a broad scope that extends to all phases of building delivery. We view commissioning
as a building delivery embedded process that persistently verifies and validates design intent throughout the ...
Vision of a Multi Properties Owner
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2004)