Now showing items 1-3 of 3

    • Turner, W. D.; Liu, M.; Claridge, D. E.; Haberl, J. S. (Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University; Department of Mechanical Engineering, Texas A&M University, 1996)
      The term Continuous Commissioning (CC) was first used by engineers at the Energy Systems Lab (ESL) at Texas A&M University to describe an ongoing process which improves the operation of buildings using measured hourly ...
    • Deng, S.; Claridge, D. E.; Turner, W. D.; Bruner, H. L.; Williams, L.; Riley, J. G. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2006)
      The $35 million in measured savings for the ten-year, $7 million continuous commissioning (CC) program at the Texas A&M University (TAMU) makes the decision to continue easy. In today's energy environment and with the ...
    • Liu, Z.; Baltazar-Cervantes, J. C.; Haberl, J. S. (Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2003)
      This is the report and manual for the Texas LoanSTAR Program Savings Calculation Workbook. The purpose of this report is to document the Texas LoanSTAR Program Savings Calculation Workbook to be used by the State Energy ...