dc.description.abstractDuring the past two decades, Lean Construction has been utilized in over 200 pilot projects in different countries all over the world except for China. Although qualitative inquiries have been made regarding the applicability of the Last Planner System of Production Control (hereafter referred to as LPS) in China, on site exploration effort of LPS implementation in China is still lacking, and subsequently the clear strategies for implementation on site. The thesis presented the first on site exploration of LPS in China to the scholars and researchers from the lean community worldwide. The main method used in this thesis is case study and literature review. Case study was used to expose the challenges for implementing LPS in China while the literature review was used to find solutions for one challenge revealed in the case study. Major findings of this study include: (1) the main constraints of LPS in China are exclusion of foremen during the planning process, no update on planning information, and lack of cooperation among different parties; (2) the power distance inside the general contractor is relatively easy to solve comparing to the power distance between general contractors and subcontractors; (3) the team leader of the trade foremen can serve as the last planner in China. Findings from a literature review suggest that power distance can be reduced if top management authorizes changes to encourage and reward subordinates to express their opinions. This thesis recommends further research on the adaption of LPS in China. Future work on more pilot projects in China is needed to initiate the use of LPS by Chinese contractors, and then further increase the use of LPS worldwide.en
dc.format.mimetypeapplication/pdf
dc.language.isoen
dc.subjectLast Planner Systemen
dc.subjectLean Constructionen
dc.subjectChinaen
dc.subjectPercent Plan Completeen
dc.subjectConstraint Analysisen
dc.titleExploration of Implementation of the Last Planner System of Production Control by Chinese Contractors: A Case Studyen
dc.typeThesisen
thesis.degree.departmentConstruction Scienceen
thesis.degree.disciplineConstruction Managementen
thesis.degree.grantorTexas A & M Universityen
thesis.degree.nameMaster of Scienceen
thesis.degree.levelMastersen
dc.contributor.committeeMemberFernández-Solís, José
dc.contributor.committeeMemberHill, Rodney
dc.type.materialtexten
dc.date.updated2016-04-06T15:40:02Z
local.embargo.terms2017-12-01
local.etdauthor.orcid0000-0003-0959-3618


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record