Texas A&M University LibrariesTexas A&M University LibrariesTexas A&M University Libraries
    • Help
    • Login
    OAKTrust
    View Item 
    •   OAKTrust Home
    • Colleges and Schools
    • Office of Graduate and Professional Studies
    • Electronic Theses, Dissertations, and Records of Study (2002– )
    • View Item
    •   OAKTrust Home
    • Colleges and Schools
    • Office of Graduate and Professional Studies
    • Electronic Theses, Dissertations, and Records of Study (2002– )
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Automated and Optimized Project Scheduling Using BIM

    Thumbnail
    View/ Open
    FAGHIHI-DISSERTATION-2014.pdf (4.032Mb)
    Date
    2014-04-04
    Author
    Faghihi, Vahid
    Metadata
    Show full item record
    Abstract
    Construction project scheduling is one of the most important tools for project managers in the Architecture, Engineering, and Construction (AEC) industry. The Construction schedules allow project managers to track and manage the time, cost, and quality (i.e. Project Management Triangle) of projects. Developing project schedules is almost always troublesome, since it is heavily dependent on project planners’ knowledge of work packages, on-the-job-experience, planning capability, and oversight. Having a thorough understanding of the project geometries and their internal interacting stability relations plays a significant role in generating practical construction sequencing. On the other hand, the new concept of embedding all the project information into a three-dimensional (3D) representation of a project (a.k.a. Building Information Model or BIM) has recently drawn the attention of the construction industry. In this dissertation, the author demonstrates how to develop and extend the usage of the Genetic Algorithm (GA) not only to generate construction schedules, but to optimize the outcome for different objectives (i.e. cost, time, and job-site movements). The basis for the GA calculations is the embedded data available in BIM of the project that should be provided as an input to the algorithm. By reading through the geometry information in the 3D model and receiving more specific information about the project and its resources from the user, the algorithm generates different construction schedules. The output Pareto Frontier graphs, 4D animations, and schedule wellness scores will help the user to find the most suitable construction schedule for the given project.
    URI
    https://hdl.handle.net/1969.1/152576
    Subject
    Construction Project Schedule
    Building Information Model
    Genetic Algorithm
    Optimization
    Collections
    • Electronic Theses, Dissertations, and Records of Study (2002– )
    Citation
    Faghihi, Vahid (2014). Automated and Optimized Project Scheduling Using BIM. Doctoral dissertation, Texas A & M University. Available electronically from https : / /hdl .handle .net /1969 .1 /152576.

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Advanced Search

    Browse

    All of OAKTrustCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsDepartmentTypeThis CollectionBy Issue DateAuthorsTitlesSubjectsDepartmentType

    My Account

    LoginRegister

    Statistics

    View Usage Statistics
    Help and Documentation

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV