Show simple item record

Visit the Energy Systems Laboratory Homepage.

dc.creatorWei, G.
dc.creatorZhou, J.
dc.creatorTurner, D.
dc.date.accessioned2013-04-30T20:48:34Z
dc.date.available2013-04-30T20:48:34Z
dc.date.issued2009-11
dc.identifier.otherESL-IC-09-11-27
dc.identifier.urihttps://hdl.handle.net/1969.1/148724
dc.description.abstractContinuous Commissioning (CC) is a process that resolves operating problems, optimizes the HVAC system operation and controls to reduce building energy consumption and improve comfort based on current building conditions and requirements. The process typically achieves 15% whole building energy cost reduction with simple paybacks of less than two years. It has been used in over 450 federal, institutional, university, and commercial buildings and central plants with measured savings of over $100 million and 12.5 trillion Btus in primary energy since 1993.en
dc.language.isoen_US
dc.publisherEnergy Systems Laboratory
dc.titleIntegration of Continuous Commissioning as a Measure in LoanSTAR and Energy Services Contractsen
dc.typePresentationen
dc.rights.requestablefalseen


This item appears in the following Collection(s)

Show simple item record