Browsing by Subject "schedule"
Now showing items 1-2 of 2
-
(2016-08-04)This study identifies key construction cost and schedule performance determinants related to project general characteristics, specific features, and construction best practices for heavy industrial projects. This research ...
-
(2012-07-16)This research endeavor investigated the possibility to combine the visual advantages of both graphical schedule visualization methods, the Linked Gantt Charts (LGC) and Flowline graphs (FLG), derived from the activity-based ...