Browsing by Subject "Retrofit Projects"
Now showing items 1-2 of 2
-
(Energy Systems Laboratory (http://esl.tamu.edu), 1985-05)We have surveyed 113 plants for thirteen clients. The results of 21 recent surveys at today's average fuel price, show an average project scope generation of $151,000 while saving about 5MMBTU/hour with a 72% DCF rate ...
-
(Energy Systems Laboratory (http://esl.tamu.edu), 2009-11)Continuous Commissioning® (CC®) is a process that resolves operating problems, optimizes the HVAC system operation and controls to reduce building energy consumption and improve comfort based on current building conditions ...