Browsing by Subject "Prestressed Concrete"
Now showing items 1-2 of 2
-
(2020-04-30)The evaluation of existing concrete infrastructure is needed as design approaches have changed and load demands have increased due to traffic volume increase over the decades. The concrete structures experience increasing ...
-
(2017-05-05)When bridge spans exceed 45 m it is necessary to have modular construction methods to effectively join the segments in-span and form a continuous structure with substantially longer span lengths. In-span splicing of ...