Browsing by Subject "Pre-Closing Treatment"
Now showing items 1-2 of 2
-
(Energy Systems Laboratory (http://esl.tamu.edu), 2009-11)The smart operation strategies were implemented for Air-Conditioning (A/C) and lighting systems to reduce the national load at Ministries Complex (MC) in the state of Kuwait. The A/C system in MC is a district cooling ...
-
(Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)An innovative approach was developed and implemented in eight governmental buildings to reduce their load during the peak demand hours in summer of 2007. The innovative approach implemented in these buildings included ...