Now showing items 1-1 of 1

    • Grigoriu, Liliana (2010-07-14)
      We consider the problem of scheduling a given set of tasks on multiple pro- cessors with predefined periods of unavailability, with the aim of minimizing the maximum completion time. Since this problem is strongly NP-hard, ...