Now showing items 1-1 of 1

    • Robinson, J.; Bryant, J.; Turner, W. D. (Energy Systems Laboratory (http://esl.eslwin.tamu.edu), 1993-03)
      Insertion paddlewheel flowmeters were removed from field installations after 12 to 24 months of service for inspection and calibration. The tests were designed to identify meter degradation because of scale and debris on ...