Browsing by Subject "EnergyPlus"
Now showing items 1-8 of 8
-
(2019-10-30)Building Commissioning is important for evaluating energy and dollar savings in existing buildings. Energy Systems Lab of Texas A&M University has developed WinAM with the purpose of aiding that process. WinAM is a ...
-
(2022-07-20)During the design phase of a building project, evaluation of outdoor thermal environment is very difficult and time consuming and is generally neglected as an intractable performance dimension. The task is burdensome due ...
-
(Energy Systems Laboratory (http://esl.tamu.edu), 2008-12)EnergyPlus (EPlus) is becoming widely used for building simulation. Previous studies have compared the performance of EPlus with other simulation programs including DOE-2 for a variety of cases. These studies identified ...
-
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2001)This is the final report for the ASHRAE 1093-RP project. This report presents the method used to derive the diversity factors and typical load shapes of lighting and receptacle loads in office buildings. In this report the ...
-
(2017-06-17)This paper presents the findings of a study that evaluated the daylight performance of three toplighting systems: skylights, lightscoops, and roof monitors for office buildings in Thailand. These toplighting systems were ...
-
(2011-10-21)Single Duct Variable Air Volume (SDVAV) systems use series and parallel Fan Powered Terminal Units to control the air flow in conditioned spaces. This research developed a laboratory verified model of SDVAV systems that ...
-
(2015-08-10)This dissertation presents the results of a study to determine the operational control, energy performance and comfort conditions associated with passive chilled beams for office buildings in a humid climate and to develop ...
-
(Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)Continuous Commissioning® (CC®) was performed on a 24,446 square foot institutional building used primarily to house offices and conference rooms. The building was constructed in 1950, and then had a complete Heating, ...