Now showing items 1-5 of 5

    • Claridge, D. E.; Liu, J.; Baltazar, J. C. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2010)
      At the beginning of an existing building commissioning (EBCx)/energy retrofit project, some form of screening is usually applied to determine whether there is sufficient potential for savings to justify a formal EBCx ...
    • Ruffin, Alaina Jones (2019-04-04)
      The primary goal of this study was to quantify the impact of Continuous Commissioning®^1 (CC®) since the inception of the process in the early 1990s using a comprehensive evaluation of the impact of CC® projects implemented ...
    • Steele, N. W. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 1980)
      Significant progress has been made in reducing energy consumption via housekeeping, maintenance, procedural changes and implementation of several hundred capital-related energy conservation projects. Better understanding ...
    • Kim, H.; Baltazar, J. C.; Haberl, J. (Energy Systems Laboratory (http://esl.tamu.edu), 2011-01)
      This report presents estimates of the energy cost savings to be achieved from 2009 International Energy Conservation Code (IECC) code-compliant, single-family residences in Texas compared to the pre-2009 IECC codes, ...
    • Bishop, D. L. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 1980)
      Several years ago, a training session was being held at an electric generating plant in the Midwest. One of the subjects covered in the session was steamline drain traps. One of the trainees checked several of the steam ...