Browsing by Subject "Blowout"
Now showing items 1-2 of 2
-
(2014-12-15)Annulus Pressure Buildup (APB) is one of the major design considerations/problems for deepwater wells. APB is even more problematic in High Pressure/High Temperature (HP/HT) wells. High flow rates could potentially worsen ...
-
(2015-11-30)Human factors (HFs) are important factors to the Macondo well blowout, but traditional risk assessment has not addressed them. Some common methodologies for offshore drilling risk assessment are fault tree, event tree and ...