Now showing items 1-4 of 4

    • Alshethry, Faisal Abdulrahman M (2017-07-20)
      The petrochemical industry is subject to various federal and local regulations and requirements that are challenging to meet and resource-intensive. Time and human factors often lead to a “check box” mentality where ...
    • Whitaker, W. S. (Energy Systems Laboratory (http://esl.eslwin.tamu.edu), 1987-09)
      This paper describes the recent audit of the utility distribution meters in a petrochemical plant. These meters measure the steam, condensate, natural gas, water, nitrogen and air flows to the different process units ...
    • Parekh, P. S. (Energy Systems Laboratory (http://esl.tamu.edu), 2000-04)
      An investment-grade compressed air audit, analysis, design, and upgrade in an industrial facility requires a thorough understudying of original design basis, current problem definition, goal settings, load assessment, base ...
    • Randaxhe, F.; Bertagnolio, S.; Lemort, V. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2012)
      The case study presented here falls within a project of feasibility studies to improve the energy efficiency, the carbon footprint and the environmental impacts of several administrative buildings in France. The first part ...