    • Pang, X.; Liu, M.; Zheng, B. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2005)
    • Pang, X.; Zheng, B.; Liu, M. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2006)
      The case study building is a two-story office facility with total floor area of 31000 square feet, of which most is open space office. The HVAC system operates 24 hours a day, 7 days a week. An energy audit was conducted ...
    • Wu, L.; Pang, X.; Liu, M.; Wang, J.; Lewis, T. G. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2007)
      The Continuous Commissioning Leading Project (CCLEP) process is an ongoing process to apply Continuous Commissioning (CC) system optimization theory and advanced technologies in commercial retrofit projects. The CCLEP ...
    • Zheng, B.; Liu, M.; Pang, X.; Wang, J.; Hansen, K. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2005)
    • Cho, Y.; Pang, X.; Liu, M. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2007)
      This paper demonstrates the implementation of new innovative technologies during continuous commissioning (CC®) practices to improve building operations and reduce energy costs. The case study building is a 5-story office ...