Browsing by Author "Neumann, C."
Now showing items 1-5 of 5
-
Application of Inverse Models for Long-Term-Energy-Monitoring in the German Enbau: Monitor Project Neumann, C.; Herkel, S.; Lohnert, G.; Voss, K.; Wagner, A. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2006)in order to pave the way for energy savings and utilizing solar energy in non residential buildings, the german federal ministry of economics and technology (bmwi) has established an energy research program called "energy ...
-
Komhard, S.; Neumann, C. (Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)The potential to save energy by changing operational parameters - especially in existing commercial buildings – is in the magnitude of 5-30%. In order to realize this saving potential in the long term, continuous commissioning ...
-
Schmidt, F.; Neumann, C. (Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)The Save Project BuildingEQ “Tools and methods for linking EPBD and continuous commissioning” develops technologies to derive baselines from the information collected during the energy assessment process and rules which ...
-
Hans, O.; Voss, K.; Wagner, A.; Gossner, H.; Grunewald, J.; Petzold, H.; Herkel, S.; Pfafferott, J.; Lehmann, D.; Neumann, C. (Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)In 1995, the German Federal Ministry of Economics and Technology launched an intensive research and demonstration programme on energy-optimised construction of new buildings as well as retrofitting the building stock. ...
-
Burhenne, S.; Elci, M.; Jacob, D.; Neumann, C.; Herkel, S. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2010)Building performance simulations can support the commissioning process of buildings. This paper introduces an approach to implement saving measures using sensitivity analysis with a simulation model and data analysis of ...