Show simple item record

Visit the Energy Systems Laboratory Homepage.

dc.creatorWen, Y.
dc.creatorZhao, F.
dc.date.accessioned2007-05-07T20:51:46Z
dc.date.available2007-05-07T20:51:46Z
dc.date.issued2006
dc.identifier.otherESL-IC-06-11-310
dc.identifier.urihttps://hdl.handle.net/1969.1/5472
dc.description.abstractBased on the weather data of a standard year in Wuhan, derived from the data of the latest 15 years, the data for the BIN (temperature and humidity frequency) method of an annual and 8-hour system were calculated. Then the BIN method was adopted to simulate the annual energy consumption of groundwater heat pump systems (GWHPS) for an office building in Wuhan. Its annual energy consumption was obtained and compared with the partner of the air source heat pump systems (ASHPS). The results show that the energy consumption of the former was approximately less 23.3% than that of the latter in summer and 19.1% in winter.en
dc.format.extent108783 bytesen
dc.format.mimetypeapplication/pdf
dc.language.isoen_US
dc.publisherEnergy Systems Laboratory (http://esl.tamu.edu)
dc.publisherTexas A&M University (http://www.tamu.edu)
dc.subjectheat pumpen
dc.subjectair conditioningen
dc.subjectenergy consumption simulationen
dc.subjectBIN methoden
dc.titleEnergy Consumption Simulation and Analysis of Heat Pump Air Conditioning System in Wuhan by the BIN Methoden


This item appears in the following Collection(s)

Show simple item record